Commissioning
20
3.2
Preparing the inoLab Level 3 measuring
system
A measuring module that is ready for operation looks as
follows:
11
10
9
8
7
1
Cable holder
2
Stand rod
3
Opening to the cable shaft
4
Connection cable to the terminal (AK M-T)
6
Locking holder
7
Beaker with test solution
8
Probe
9
Freely adjustable probe holder
10
Locking key for probe holder
11
Connection cable: Probe - measuring module
1
2
3
4
5
6