wtw inoLab Level 3 Operating Manual page 21

Measuring system with active multifunction boxes
Table of Contents

Advertisement

Preparing the
module
Perform the following activities before commissioning the
system:
l
Prepare the measuring module
l
Connect the probe
l
Connect the terminal
l
Connect the plug-in power supply
l
Connect the system upgrades
1
Place the measuring module on a flat surface and
protect it from intense light and heat.
2
Insert the stand rod (2) into the measuring module.
3
Fix the probe holder (9) onto the stand rod.
4
Adjust the height of the probe holder (9) using the
locking key (10).
Commissioning
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inolab 740

Table of Contents