Measurements; Connections - ABB SACE Emax E1.2 Operating Instructions For The Design Engineer

Sace emax 2 series low voltage air circuit-breakers
Hide thumbs Also See for SACE Emax E1.2:
Table of Contents

Advertisement

Measurements The following table lists the measurement accuracy for the modules:
Connections The modules must be mounted directly on the Mainboard, to the right of the trip unit. In parallel they are
A4
X
XV
N
L1
L2
L3
A1
K51
MEAS
XV
X
A4
180 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Quantity
Phase-to-phase voltage
Frequency
(2)
(1)
With phase-to-phase voltage V greater than 690 V AC rated voltage (maximum 760 V AC), in the presence of
external sockets and an isolation transformer.
(2)
The measurement of the frequency is available with a a phase-to-phase voltage value ≥ 36 V AC, and is
unavailable with a phase-to-phase voltage value ≤ 32 V AC.
(3)
In the absence of harmonic distortion.
connected to a connector, to which the phase and neutral voltages arrive either on the internal contacts of
the circuit-breaker, or on the external sockets.
Information on the assembly is available on the website http://www.abb.com/abblibrary/DownloadCenter/, in
particular in the kit sheet 1SDH001000r0505.
IMPORTANT: in the case of dielectric tests, you need to disconnect the modules as
illustrated in the assembly diagram, and to disconnect the external sockets from the
terminal box. It is not necessary to remove the modules.
An example with an E2.2 circuit-breaker in fixed and withdrawable versions is provided to the side.
The following is a view of the terminal box of E1.2 and E2.2-E4.2-E6.2 circuit-breakers with the relevant wiring
diagram:
95
35
96
36
98
38
S51
S33
61
71
81
91
01
51
95
35
HC
H1
H2
H3
H4
62
72
82
92
02
52
96
36
HC
K3
K4
K5
K6
64
74
84
94
04
54
98
38
HC
K7
K8
K9
K10
Q5..Q10
EKIP Signalling 4K
S51
S33
20
N
VN
V3
V2
V1
VN
V3
V2
V1
L1 L2 L3
K51
MEAS
Diagrams 20 - 21 - 22 - 23
Further information is available on page 174, or on the website http://www.abb.com/abblibrary/
DownloadCenter/, where the wiring diagram is available 1SDm000091r0001.
Range
100...1150 V AC
(1)
30...80 Hz
R1
V3
Vn
Ge
Szi
U1
R2
V2
Rct
Ge-
Szo
U2
V1
Gzo
Szc
Gzi
M
YR
Trip Unit I/O
Module
R1
V3
Vn
Ge
Szi
U1
R2
V2
Rct
Ge-
Szo
U2
V1
Gzo
Szc
Gzi
M
YR
Trip Unit I/O
Module
Module
21
PE
VN
V3
V2
V1
VN
VN
V3
V2
V1
VN
L1
L2
L3
K51
MEAS
Accuracy
± 0.5 % @ 45...66 Hz
± 0.1 %
(3)
Ne-
45
D1
W3
K1
Ne
46
W4
K2
Rca
48
D2
YU
TU
Module
EKIP Supply
RTC
I/O
YO2
Ne-
W3
K1
Ne
W4
K2
Rca
TU
Module
EKIP Supply
I/O
22
TU1
N
L1
L2
L3
A1
a1
L1 L2
L3
B1
b1
A2
a2
B2
b2
GS
3~
a3
A3
B3
b3
E)
*
AB)
*
V3
V2
V1
V3
V2
V1
K51
MEAS
Electronic accessories | 3 - Ekip Measuring modules
ABB | SACE Emax 2
C1
C11
11
21
31
41
C3
C13
12
22
32
42
C2
C12
14
24
34
44
YC
YO
Q1
Q2
Q3
Q4
45
D1
C1
C11
C21
11
21
31
41
46
C3
C13
12
22
32
42
48
D2
C2
C12
C22
14
24
34
44
YU
RTC
YC
YO
YC2
Q1
Q2
Q3
Q4
YO2
23
VN
V3
V2
V1
VN
V3
V2
V1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents