Commissioning; General Commissioning Information - Siemens SIMOTICS S-1FL6 Operating Instructions Manual

Sinamics / simotics
Hide thumbs Also See for SIMOTICS S-1FL6:
Table of Contents

Advertisement

Commissioning

5.1

General commissioning information

Prior to commissioning, read "Basic operator panel (BOP) (Page 111)" for more information
about the BOP operations. In case of any faults or alarms during commissioning, refer to
Chapter "Diagnostics (Page 251)" for detailed description.
Carefully read the safety instructions
Before your commissioning or operation, read the safety instructions in Chapter
"Fundamental safety instructions (Page 9)" carefully. Failure to observe the instructions
may cause serious effects.
Material damages and personal injuries by the drop of a hanging axis
When the servo system is used as a hanging axis, the axis will drop if the positive and
negative poles of the 24 V power supply are connected inversely. Unexpected drop of the
hanging axis may cause material damages and personal injuries.
Before commissioning, a crosstie must be used to hold the hanging axis in prevention of an
unexpected drop. In addition, make sure that the 24 V power supply is correctly connected.
NOTICE
Firmware damage due to drive power-off during data transfer
Switching off the 24 V power supply for the drive during data transfer from the micro SD
card/SD card to the drive can cause damage to the drive firmware.
• Do not switch off the drive power supply when the data transfer from the micro SD
SINAMICS V90, SIMOTICS S-1FL6
Operating Instructions, 09/2016, A5E37208830-002
CAUTION
WARNING
card/SD card to the drive is in process.
5
103

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics v90

Table of Contents