ABB REG670 Applications Manual page 355

Relion 670 series generator protection
Hide thumbs Also See for REG670:
Table of Contents

Advertisement

1MRK 502 071-UEN -
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Application manual
Single phase-to-
earth fault
IEC05000492 V2 EN
Figure 185:
Step 1 fault calculation 1
This calculation gives the current fed to the protection: 3I
To assure that step 1, selectivity to other earth-fault protections in the network a short
delay is selected. Normally, a delay in the range 0.3 – 0.4 s is appropriate. To assure
selectivity to line faults, tripped after a delay (typically distance protection zone 2) of
about 0.5 s the current setting must be set so high so that such faults does not cause
unwanted step 1 trip. Therefore, a fault calculation as shown in Figure
Single phase-to-
earth fault
IEC05000493 V2 EN
Figure 186:
Step 1 fault calculation 1
YN/D or YN/Y
transformer
Three phase CT
summated
3I
0
alt
Single CT
IN
>
IEC05000492-en-2.vsd
YN/D or YN/Y
transformer
Three phase CT
summated
3I
0
alt
Single CT
IN
>
IEC05000493-en-2.vsd
Section 9
Current protection
.
0fault1
186
is made.