Section 24
Requirements
24.6
760
During disturbed conditions, the trip security function can cope with high bit error
-5
rates up to 10
or even up to 10
independent of COMFAIL from the differential protection communication
supervision, or blocked when COMFAIL is issued after receive error >100ms.
(Default).
Synchronization in SDH systems with G.703 E1 or IEEE C37.94
The G.703 E1, 2 Mbit shall be set according to ITU-T G.803, G.810-13
One master clock for the actual network
The actual port Synchronized to the SDH system clock at 2048 kbit
Synchronization; bit synchronized, synchronized mapping
Maximum clock deviation <±50 ppm nominal, <±100 ppm operational
Jitter and Wander according to ITU-T G.823 and G.825
Buffer memory <250 μs, <100 μs asymmetric difference
Format.G 704 frame, structured etc.Format.
No CRC-check
Synchronization in PDH systems connected to SDH systems
Independent synchronization, asynchronous mapping
The actual SDH port must be set to allow transmission of the master clock from
the PDH-system via the SDH-system in transparent mode.
Maximum clock deviation <±50 ppm nominal, <±100 ppm operational
Jitter and Wander according to ITU-T G.823 and G.825
Buffer memory <100 μs
Format: Transparent
Maximum channel delay
Loop time <40 ms continuous (2 x 20 ms)
IED with echo synchronization of differential clock (without GPS clock)
Both channels must have the same route with maximum asymmetry of 0,2-0,5
ms, depending on set sensitivity of the differential protection.
A fixed asymmetry can be compensated (setting of asymmetric delay in built in
HMI or the parameter setting tool PST).
IED with GPS clock
Independent of asymmetry.

IEC/UCA 61850-9-2LE Merging unit requirements

The merging units that supply the IED with measured values via the process bus must
fulfill the IEC/UCA 61850-9-2LE standard.
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
-4
. The trip security can be configured to be
1MRK 502 071-UEN -