The calculated time to reset of lockout is available as a real figure signal, TENRECL.
The protection has a reset input: RESET. By activating this input the calculated
temperature is reset to its default initial value. This is useful during testing when
secondary injected current has given a calculated "false" temperature level.
IL1, IL2, IL3
Calculation
of final
temperature
IEC09000637 V1 EN
Figure 51:
Functional overview of LCPTTR/LFPTTR
Current protection
Final Temp
> TripTemp
actual temperature
Calculation
of actual
temperature
Actual Temp >
AlarmTemp
Actual Temp
> TripTemp
Lock-
out
logic
Actual Temp
< Recl Temp
Calculation
of time to
trip
Calculation
of time to
reset of
lockout