Section 2 Set Up Work Schedules And Work Periods - NEC univerge sv8100 Installation Manual

Automatic call distribution acd
Hide thumbs Also See for univerge sv8100:
Table of Contents

Advertisement

UNIVERGE SV8100
A
S
3
SSIGN
ECTION
In this step you will assign ACD Groups and the member extensions, set up in
Arrange Extensions into ACD Groups on page
will use the Work Schedules and Work Period durations you have already set up in
Set Up Work Schedules and Work Periods on page
implements the schedules and periods you have set up.
Use the
Assignment Worksheet (41-02-01) on page 2-8
member extensions for each daily Work Period.
1.
2.
ACD Installation Manual
ACD Agent Work Schedule Worksheet (41-05-01)
ACD Work Schedule Number (1-4)
Day(s) of Week
Work Period
1
2
3
4
5
6
7
8
E
XTENSIONS FOR
ACD Assignment Worksheet (41-02-01) on page 2-9
Enter the extension number in an ACD Group.
In the Extension column of the worksheet, enter the extension you entered in
the
ACD Group Worksheet on page
Assignment Worksheet as required. The sample worksheet below includes
extensions 105, 107, 117, 139, 109, 111, and 115. To make it easier to visualize
the groups, the extensions are entered consecutively by ACD Group.
Enter an ACD Number for each extension number.
ACD numbers are software assignments the system needs when configuring
ACD. There are 512 possible ACD numbers. Wherever possible, try to make
your ACD numbers in consecutive order.
(41-07-01)
Start Time
E
W
ACH
ORK
2-1, for each daily Work Period. ACD
to assign ACD Groups and the
2-3. Make additional copies of the ACD
End Time
P
ERIOD
2-4. Your system automatically
and the
Sample ACD
Issue 4.0
2 - 7

Advertisement

Table of Contents
loading

Table of Contents