Christie Roadie HD+35K User Manual page 18

Hide thumbs Also See for Roadie HD+35K:
Table of Contents

Advertisement

Section 2: Installation and Setup
4. Connect to Lamp Ballast and Power.
Head to Ballast
Connect all four ballast cables. There are two DC power cables, and two communication/control cables
between the projector rear and lamp ballast as shown in
Ballast to AC
Refer to
Figure
NOTE:
Before connecting the ballast to the AC supply, a Christie accredited service technician must make sure the
ballast's plug type and Input Power Range Switch match the line voltage available at the site. Remove the
lamp ballast cover to access the switch and determine it's setting-toggle LEFT for 200 VAC supplies,
toggle RIGHT for 400 VAC supplies (factory default=200 VAC). Change the plug type as necessary as a
delta load with safety ground has no neutral.
Connect the ballast's integral three-phase 30-amp line cord to your AC supply. You may have to change the
plug type for your site.
2-2
1) Connect all four cables to the projection head prior to switching the ballast's
breaker/power switch ON. 2) Follow all labeling exactly.
Figure 2-2 Connect Head to Ballast
2-3.
Figure
2-2.
Projector Rear
Roadie HD+35K User Manual
020-100340-02 Rev. 1 (01-2010)

Advertisement

Table of Contents
loading

Table of Contents