Install Input And Output Shaft; Install Shift Forks And Shift Fork Shafts - Toyota MR2 1988 Repair Manual

Table of Contents

Advertisement

MT-28
MANUAL TRANSAXLE - C52 Transaxle
826!;6
82663
82721
(f)
Using SST and torque meter, measure the preload.
SST 09564-32011
Preload (starting):
New bearing
8- 16
kg-em
Reused bearing
(6.9- 13.9
in.-lb,
0.8- 1.6
N·m)
5- 10 kg-em
(4.3 - 8. 7 in.-lb, 0.5 - 1.0 N·m)
If the preload is not within specification, remove the
transmission case side outer race of the side bearing with
SST.
Reselect an adjusting shim.
NOTE:
The preload will change about 3 - 4 kg-em (2.6
- 3.5 in.-lb, 0.3 - 0.4 N·m) with each shim thickness.
Mark
Thickness
mm (in.l
Mark
Thickness
mm lin.)
A
2.10
(0.0827)
L
2.60
8
2.15
(0.0846)
M
2.65
c
2.20
(0.0866)
N
2.70
D
2.25
(0.0886)
p
2.75
E
j
2.30
(0.0906)
I
a
2.80
F
2.35
(0.0925)
R
2.85
G
2.40
(0.0945)
5
2.90
H
2.45
(0.0965)
T
2.95
J
2.50
(0.0984)
u
3.00
K
2.55
(0.1004)
19.
REMOVE TRANSMISSION CASE
20. INSTALL INPUT AND OUTPUT SHAFT
Install the input and output shafts together.
(0.1024)
(0.1 043)
(0. 1 063)
(0.1083)
(0. 1 1 02)
(0. 1 1 22)
(0. 1 1 42)
(0.1161)
(0. 1 181)
21. INSTALL SHIFT FORKS AND SHIFT FORK SHAFTS
(a)
Place No. 1 and No. 2 shift forks into the groove of
No. 1 and No. 2 hub sleeves.

Advertisement

Table of Contents
loading

Table of Contents