IBM TotalStorage SAN32M-2 Installation And Service Manual page 234

Hide thumbs Also See for TotalStorage SAN32M-2:
Table of Contents

Advertisement

Replacement
208
SAN32M-2 Installation and Service Manual
— At the management server (Element Manager application),
select Event Log from the Logs menu.
The following event codes appear:
• 200 - Power supply AC voltage failure (recorded when power
is disconnected).
• 206 - Power supply removed.
• 300 - Cooling fan propeller failed.
To replace a redundant power supply:
1. Remove the replacement power supply from its packaging.
2. Inspect the rear of the power supply for bent or broken connector
pins damaged during shipping. If any pins are damaged, obtain a
new power supply.
3. Position the power supply in the rear of the switch as shown in
part (2) of
Figure
70. Ensure the finger handles are disengaged
and rotated 90 degrees outward.
a. While supporting the power supply with one hand, insert it
into the switch chassis.
b. Firmly push the power supply into the chassis. Rotate the
finger handles 90 degrees inward to seat the power supply and
engage the connector pins. Ensure the faceplate is flush with
the chassis cutout.
4. Connect the AC power cord to the power supply and a facility
power source.
5. Wait several seconds, then inspect the power supply to ensure the
amber LED extinguishes. If the LED illuminates, go to
Start MAP
to isolate the problem.
6. Inspect the Event Log:
— At a web browser communicating with the EFCM Basic
Edition interface, select Event from the Logs menu.
— At the management server (Element Manager application),
select Event Log from the Logs menu.
Ensure the following event codes appear:
• 203 - Power supply AC voltage recovery.
• 207 - Power supply installed.
MAP 0000:

Advertisement

Table of Contents
loading

Table of Contents