Clean Fiber-Optic Components - IBM TotalStorage SAN32M-2 Installation And Service Manual

Hide thumbs Also See for TotalStorage SAN32M-2:
Table of Contents

Advertisement

3. Insert the transceiver into the port receptacle, then engage the
locking mechanism by rotating the wire bale up or down 90
degrees as shown in
4. Perform an external loopback test. Refer to
(EFCM Basic Edition) or
application) for instructions. If the test fails, go to
MAP
to isolate the problem.
5. Reconnect the fiber-optic jumper cable:
a. Remove the protective cap from the cable connector and the
protective plug from the port optical transceiver. Store the cap
and plug in a suitable location for safekeeping.
b. Clean the jumper cable and transceiver connectors. Refer to

Clean fiber-optic components

c. Insert the keyed LC cable connector into the port's optical
transceiver.
6. Ensure the amber port LED extinguishes. If the LED illuminates,
go to
MAP 0000: Start MAP
7. Inspect the Event Log:
— At a web browser communicating with the EFCM Basic
Edition interface, select Event from the Logs menu.
— At the management server (Element Manager application),
select Event Log from the Logs menu.
Ensure an event code 510 (SFP optics hot-insertion initiated)
appears. If the event code does not appear, go to
MAP
to isolate the problem.
8. Verify port operation:
— At a web browser communicating with the EFCM Basic
Edition interface, open the Hardware View:
a. Ensure alert symbols do not appear (yellow triangle or red
diamond).
b. Open the Port List View. Verify that port Operational State,
Type, Health Status, and Transceiver are correct.
— At the management server (Element Manager application),
open the Hardware View:
Chapter 5: Removal and replacement procedures
Figure
69.
External loopback test
External loopback test
for instructions.
to isolate the problem.
(SAN management
MAP 0000: Start
MAP 0000: Start
205

Advertisement

Table of Contents
loading

Table of Contents