E1.S / E3.S Hot-Swap Drive Replacement - Lenovo ThinkSystem SR675 V3 User Manual

Hide thumbs Also See for ThinkSystem SR675 V3:
Table of Contents

Advertisement

• Read
"Installation Guidelines" on page 45
work safely.
• Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
Watch the procedure
A video of this procedure is available at YouTube:
AgTVLhsU24Nhel3_oYlnGT
Procedure
Step 1.
Align the 2.5-inch drive cage assembly with the opening on the front of the server; then, slide the
drive cage assembly into the chassis until it is seated in place.
Step 2.
Fasten the two thumbscrews to secure the drive cage assembly to the chassis.
Figure 125. 2.5-inch drive cage assembly installation
After you finish
1. Reconnect the power and signal cables to the 2.5-inch drive backplane.
2. Reinstall the 2.5-inch hot-swap drives or drive bay fillers (if any) into the drive bays. See
inch hot-swap drive" on page
3. Complete the parts replacement. See

E1.S / E3.S hot-swap drive replacement

Follow instructions in this section to remove and install an E1.S or E3.S hot-swap drive.
Remove an E1.S / E3.S hot-swap drive
Follow instructions in this section to remove an E1.S or E3.S hot-swap drive.
About this task
Attention:
• Read
"Installation Guidelines" on page 45
work safely.
• To make sure that there is adequate system cooling, do not operate the server for more than two minutes
without either a drive or a filler installed in each bay.
and
"Safety inspection checklist" on page 46
.
157.
"Complete the parts replacement" on page
and
"Safety inspection checklist" on page 46
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
.
Chapter 5
Hardware replacement procedures
to ensure that you
"Install a 2.5-
194.
to ensure that you
163

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d9q7d9r

Table of Contents