Server Setup Checklist - Lenovo ThinkSystem SR675 V3 User Manual

Hide thumbs Also See for ThinkSystem SR675 V3:
Table of Contents

Advertisement

Figure 20. Service Label and QR code

Server setup checklist

Use the server setup checklist to ensure that you have performed all tasks that are required to set up your
server.
The server setup procedure varies depending on the configuration of the server when it was delivered. In
some cases, the server is fully configured and you just need to connect the server to the network and an AC
power source, and then you can power on the server. In other cases, the server needs to have hardware
options installed, requires hardware and firmware configuration, and requires an operating system to be
installed.
The following steps describe the general procedure for setting up a server.
Setup the server hardware
Complete the following procedures to setup the server hardware.
1. Unpack the server package. See
2. Install any required hardware or server options. See the related topics in
replacement procedures" on page
3. If necessary, install the rail to a standard rack cabinet. Follow the instruction in Rail Installation Guide
that comes with the rail installation kit.
4. If necessary, install the server into a standard rack cabinet. See
5. Connect all external cables to the server. See
connectors locations.
Typically, you will need to connect the following cables:
• Connect server to the power source
• Connect server to the data network
"Server package contents" on page
45.
Chapter 2 "Server components" on page 15
41.
Chapter 5 "Hardware
"Install the server to rack" on page
.
Chapter 4
Unboxing and setup
57.
for
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d9q7d9r

Table of Contents