Hot-Swap Drive Replacement - Lenovo ThinkSystem SD530 V3 User Manual

Hide thumbs Also See for ThinkSystem SD530 V3:
Table of Contents

Advertisement

1. Make sure that all the required cables are routed and connected correctly; then, reinstall the top cover
(see
"Install the top cover" on page
2. Reinstall the node into the chassis (see
3. Make sure that the required power supply units are installed and power cords are connected; then,
power on the node (see
51.)
4. Proceed to complete the parts replacement (see

Hot-swap drive replacement

Follow instructions in this section to remove or install a hot-swap drive.
Remove a hot-swap drive
Follow instructions in this section to remove a hot-swap drive.
About this task
Attention:
• Make sure to save the data on the drive, especially if it is part of a RAID array, before removing it from the
node.
• To avoid damage to the drive connectors, make sure that the node top cover is installed and fully closed
whenever installing or removing a drive.
• To make sure that there is adequate system cooling, do not operate the node for more than two minutes
without either a drive or a filler installed in each drive bay.
• If one or more NVMe solid-state drives are to be removed, it is recommended to disable them beforehand
via the operating system.
• Before removing or making changes to the drives, drive controllers (including controllers that are
integrated on the system board), drive backplanes, or drive cables, make sure to back up all important
data that is stored on the drives.
• Before removing any component of a RAID array (drive, RAID card, etc.), back up all RAID configuration
information.
• Make sure to have the drive bay fillers readily available if some drive bays will be left empty after the
removal.
Procedure
Step 1.
Remove the E3.S drive cage cover.
a.
Loosen the thumbscrew on the drive cage cover.
b.
Pull the drive cage cover out of the node.
ThinkSystem SD530 V3 User Guide
94
170).
"Install a node to the chassis" on page
"Install a hot-swap power supply" on page 61
and
"Complete the parts replacement" on page
75).
"Power on the node" on page
171).

Advertisement

Table of Contents
loading

Table of Contents