Lenovo ThinkSystem SR675 V3 User Manual page 170

Hide thumbs Also See for ThinkSystem SR675 V3:
Table of Contents

Advertisement

Attention:
• Read
"Installation Guidelines" on page 45
work safely.
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
"Power off the server" on page
• If the server is installed in a rack, slide the server out on its rack slide rails to gain access to the top cover,
or remove the server from the rack. See
Watch the procedure
A video of this procedure is available at YouTube:
AgTVLhsU24Nhel3_oYlnGT
Procedure
Step 1.
Make preparation for this task.
a.
Remove the top cover. See
b.
Remove all of the 2.5-inch hot-swap drives and the drive bay fillers (if any) from the drive bays.
See
"Remove a 2.5-inch hot-swap drive" on page
surface.
c.
Disconnect the power and signal cables from the 2.5-inch drive backplane.
Step 2.
Remove the 2.5-inch drive cage assembly.
a.
Loosen the two thumbscrews that secure the drive cage assembly to the chassis.
b.
Slide the drive cage assembly out of the chassis.
Figure 124. 2.5-inch drive cage assembly removal
After you finish
If you are instructed to return the component or optional device, follow all packaging instructions, and use
any packaging materials for shipping that are supplied to you.
Install the 2.5-inch drive cage assembly
Follow instructions in this section to install the 2.5-inch drive cage assembly.
About this task
Attention:
ThinkSystem SR675 V3 User Guide
162
and
"Safety inspection checklist" on page 46
54.
"Remove the server from rack" on page
.
"Remove the top cover" on page
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
154.
156. Place the drives on a static protective
to ensure that you
54.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d9q7d9r

Table of Contents