Chapter 6 — Getting started installing the Option 11C Mini

Readiness checklist

Summary of installation procedures

553-3021-209
Standard 1.00
Have you:
read all safety instructions in "Chapter 7 — Important safety
instructions" on page 79?
Made sure that you received all the equipment that you ordered?
made sure your area meets all environmental requirements?
checked for all power requirements?
checked for proper grounding facilities?
developed an equipment layout plan for the system? See "Equipment
layout plan" on page 51.
completed the card slot assignment plan? See "Card slot assignments" on
page 59.
assembled all the tools required to proceed with the installation?
If you have completed all of the above items, you are ready to start the
installation of the Option 11C Mini system.
The following list provides a summary of the Option 11C Mini installation
procedures. Refer to the chapters indicated at the end of each step for
important and detailed information related to installation.
1
Read the safety instructions in "Chapter 7 — Important safety
instructions" on page 79.
2
Make sure that you have read and completed the instructions contained
in the Planning section of this guide.
3
Make sure that system and site requirements have been met. See
"Chapter 3 — System and site requirements" on page 27.
4
Make sure that you have created the equipment layout plan and card slot
assignment plan. See "Chapter 4 — Creating an equipment layout plan
and a card slot assignment plan" on page 51.