Nortel Meridian 1 Planning And Installation Manual page 63

Table of Contents

Advertisement

Figure 6
Typical pluggable cord Isolation Transformer wiring plan
Note 1
Shared
Panel
Neutral Bus
Gnd Bus
Note 3
Notes:
1
Power source is site dependent. It may be from a shared panel or transformer. Wiring may vary
accordingly. Wiring to panel must be housed in conduit.
2
Make SPG at the transformer secondary. If the transformer secondary has no isolated secondary
ground lug, make SPG by tieing all system ground lines to the chassis lug on the transformer case. An
insulated ground connection must be made between the SPG and a known building ground reference,
as per Note 3.
3
Terminate the option 11 SPG insulated ground conductor as near as possible to the main building
ground reference. Isolate the ground bus from panel housing if permitted by local codes. Conductor
should be minimum AWG #6 (metric #40) at all points.
4
Wiring to receptacles must be in conduit unless they are mounted on the transformer case.
5
Connection may be made by metallic conduit. Additional copper conductor recommended.
6
Minimum AWG #6 (metric #40) insulated copper conductor connected to FGND lug on the Option 11
cabinet. Route separately from AC power cable.
7
Separate breaker required for each Option 11 cabinet. Breakers must be mounted on transformer if the
receptacles are. If they are in a panel served by the transformer secondary, all connections between
the receptacles and transformer must be in conduit.
8
Connect secondary neutral (X0) to system SPG.
9
Conduit required.
Chapter 3 — System and site requirements
Note 5
Note 9
Isolation
Note 7
Transformer
••
Note 8
Note 2
Note 6
Option 11C Mini
Page 43 of 590
Note 4
120V IG
Receptacle
240V IG
Receptacle
Option 11
Cabinet
Gnd Lug
553-8322.EPS
Planning and Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Option 11c mini

Table of Contents