Chapter 3 — System and site requirements
Figure 5
Single point grounding
553-3021-209
Standard 1.00
Any of the following busbars can be used as system SPG:
building principal ground, normally in single floor buildings
floor ground bar, normally in multi-floor buildings
dedicated SPG bar bonded to the building grounding system
a section of the battery return bar of the power plant
Various subsystems, such as groups of frames or equipment, of a
telecommunications system can be configured as separate single point ground
entities connected in a star configuration to the system SPG.