Lifting System Components - Nortel 1000 Installation And Commissioning Manual

Table of Contents

Advertisement

Page 82 of 466
Rack-mounting the components

Lifting system components

NN43041-310
Standard 01.11
Note: In the 5u pattern, a "u" is equal to 1.75 in. and includes three holes
spaced at 5/8 in. + 5/8 in. + 1/2 in.
Other data communications equipment can be installed in a rack with
CS 1000E system components.
Ensure that the unit's power cord is appropriate for the area's electrical
service. Do not modify or use the supplied AC power cord if it is not the
correct type.
This chapter contains the following procedures:
Procedure 1: "Removing the cover" on
Procedure 2: "Rack-mounting a Media Gateway or Media Gateway
Expander" on
page 86
Exercise care when lifting system components. If necessary, get assistance to
lift a component or install components in a rack. Table 11 on page 82 lists the
CS 1000E system components provided by Nortel and the weight of each
component. Consult the manufacturer's documentation for the weight of
other components installed during the CS 1000E system installation.
Table 11
Weight of CS 1000E system components (Part 1 of 2)
Component
ISP1100 Signaling Server
Media Gateway without cards
— with 4 cards
October 2008
IMPORTANT!
page 84
Lbs
Kg
23
10.5
26
12
30
13.5

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000eCommunication server 1000Communication server 1000e

Table of Contents