Installing The Cp Pm Card - Nortel 1000 Installation And Commissioning Manual

Table of Contents

Advertisement

Page 106 of 466

Installing the CP PM card

NN43041-310
Standard 01.11
Installing and connecting CS 1000E hardware
5
The existing 3-port SDI cable (NTBK48AA) is reused. It connects to the
SDI port on the Chassis.
This chassis, the main chassis in the system, will now become known as
IPMG 00.
The following procedure describes how to install the CP PM card in a
Chassis.
Note: Ensure that all DIP switches are set correctly. DIP switches
determine whether the CP PM boots from a hard drive or compact flash.
Procedure 13
Installing the CP PM card
1
Ensure that the security dongle (the one that comes as part of the
software kit) is inserted on the CP PM call processor.
2
Slide the CP PM call processor into Slot 1 (or higher)
3
Lock the card into the faceplate latches.
4
Attach the SDI cable. The 50-pin Amphinol connects to the back of the
CP PM call server.
October 2008
End of Procedure
of the Chassis
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000eCommunication server 1000Communication server 1000e

Table of Contents