Hardware Upgrade
Table 27
Hardware audit
Hardware Audit
Perform the Hardware Audit prior to the scheduled upgrade.
Verify Shipping List - Complete and Accurate
Audit Site for new hardware locations
Pre Run Cables if possible
Review All switch settings for new cards
Read all applicable technical document Procedures
completely

Pre-conversion steps

Table 28
Pre-conversion steps (Part 1 of 2)
Pre Conversion Steps
A capture file should be made of the following information using a PC or Printer.
Perform an overall system check:
LD 135 SCPU (ensure that the system is redundant)
LD 137 STAT
LD 96 STAT DCH
LD 48 STAT AML
LD 32 STAT
NN43021-459
Standard 05.04
Appendix A: Upgrade checklists
Hardware audit
March 2012
Yes