2) Adjustment of the Duplex Unit Paper Take-Up Solenoid Position
Requirement
The gap between the E-ring of the plunger and the Take-Up Solenoid should be 2.5 to 3.0 mm when
the Take-Up Solenoid is OFF.
Adjustment Procedure
4. Move the Take-Up Solenoid so that the gap between the E-ring of the plunger and the Take-Up
Solenoid is 2.5 to 3.0 mm when the Take-Up Solenoid is OFF.
5. After adjustment is completed, tighten the two Take-Up Solenoid mounting screws.
1. Remove the Left Lower Door.
2. Remove eight screws and the Turnover Unit Assy.
3. Loosen the two screws by which the Take-Up Solenoid is
mounted.
1155D144AB
D-77
1155D228CA