Swapping Processors - Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual

Table of Contents

Advertisement

System board and components

14.6.3.2 Swapping processors

Preparing the processor socket load plates on the new system board
Figure 541: Opening socket release lever 1 (new system board)
Ê Unlatch the socket release lever marked Open 1st by pushing it down and
away from the socket (1).
Ê The socket release lever will slightly lift up (2).
Upgrade and Maintenance Manual
695
TX300 S8 / RX350 S8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents