Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual page 389

Table of Contents

Advertisement

I
Ensure that the GPGPU / coprocessor card power cables have been
connected to the power backplane as described in section
GPGPU / coprocessor card power cables to the power backplane" on
page
384.
Ê Press out on the locking latch to disengage the PCI slot bracket locking bar
(1, see close-up).
Ê Fold up (2) and remove (3) the PCI slot bracket locking bar.
I
The PCI slot mounting bar is no longer required if installing one or two
GPGPU / coprozessor cards. Set aside and save the mounting bar for
future use.
Figure 271: Removing the PCI slot bracket (B)
Ê Remove the slot brackets from expansion slots 5 and 6.
I
If two GPGPU or coprocessor cards are to be installed, also remove
the slot brackets from expansion slots 7 and 8.
V
CAUTION!
Keep the slot bracket for further use.
Always replace slot brackets into unused PCI slot openings to comply
with applicable EMC regulations and satisfy cooling requirements.
TX300 S8 / RX350 S8
Upgrade and Maintenance Manual
Expansion cards and backup units
"Connecting
389

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents