Standard Expansion Cards; Installing Expansion Cards - Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual

Table of Contents

Advertisement

9.2

Standard expansion cards

9.2.1

Installing expansion cards

Upgrade and Repair Unit
(URU)
Tools: Phillips PH2 / (+) No. 2 screw driver
9.2.1.1
Preliminary steps
"Suspending BitLocker functionality" on page 125
Ê
"Disabling SVOM boot watchdog functionality" on page 127
Ê
"Shutting down the server" on page 62
Ê
"Disconnecting the server from the mains" on page 63
Ê
Ê When working on a rack-mounted server:
"Extending / removing the server from the rack" on page 64
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section
page
68.
"Removing the system air duct" on page 81
Ê
TX300 S8 / RX350 S8
Upgrade and Maintenance Manual
Expansion cards and backup units
Average task duration:
10 minutes
"Opening the server" on
349

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents