Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual page 709

Table of Contents

Advertisement

15
Converting a tower server to a
rack server
Upgrade and Repair Unit
(URU)
Tools: – Phillips PH2 / (+) No. 2 screw driver
– Slotted screw driver
Safety notes
For further information, please refer to chapter
page
45.
15.1
Preliminary steps
"Shutting down the server" on page 62
Ê
"Disconnecting the server from the mains" on page 63
Ê
Ê Remove all external cables.
"Opening the server" on page 68
Ê
I
The front cover is no longer required.
Ê If applicable, remove all HDDs or HDD dummy modules from an installed
HDD extension box as described in the following sections:
"Removing a 2.5-inch HDD / SSD module" on page 211
"Removing a 2.5-inch HDD / SSD dummy module" on page 207
"Removing a 3.5-inch HDD module" on page 259
"Removing a 3.5-inch HDD dummy module" on page 255
TX300 S8 / RX350 S8
Upgrade and Maintenance Manual
Average task duration:
20 minutes
"Important information" on
709

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents