Basic hardware procedures
4.7
Switching on the server
V
CAUTION!
Before switching on the server, make sure the top / side cover is
●
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the server must not run while the top / side cover is
removed.
After connecting all power cords, wait at least 60 seconds before
●
pressing the On/Off button.
Follow the safety instructions in chapter
●
page
31.
Ê Press the On / Off button to start up the server.
Ê Ensure that the power-on indicator above the On / Off button is lit green.
Ê Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.
68
Upgrade and Maintenance Manual
"Important information" on
TX1330 M1
Need help?
Do you have a question about the Server PRIMERGY TX1330 M1 and is the answer not in the manual?