Installing The New Bbu; Concluding Steps - Fujitsu Server PRIMERGY TX1330 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for Server PRIMERGY TX1330 M1:
Table of Contents

Advertisement

Expansion cards and backup units
9.5.7.3

Installing the new BBU

Ê Install the BBU as described in section
9.5.7.4

Concluding steps

"Installing the fan module" on page 152
Ê
"Reassembling" on page 58
Ê
"Connecting the server to the mains" on page 67
Ê
"Switching on the server" on page 68
Ê
Ê If applicable,
"Updating RAID controller firmware" on page 80
"Enabling SVOM boot watchdog functionality" on page 84
Ê
Note on BBU charging and calibration
The BBU may be deeply discharged due to extended storage time and wrongly
show as bad or defective in the ServerView RAID Manager.
In this case, the BBU will automatically enter a trickle charge cycle for recovery.
This initial charge may take up to 8 hours before the BBU will initiate a
recalibration cycle.
Ê Enter the ServerView RAID Manager and check the current BBU status.
I
For further information, please refer to the "ServerView Suite RAID
Management" user guide.
Ê If the BBU is shown as bad or defective, do not power off the server for at
least 8 hours to allow the charge and calibration cycles to finish.
Ê If the BBU status does not change after 8 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I
If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
208
Upgrade and Maintenance Manual
"Installing a BBU" on page
197.
TX1330 M1

Advertisement

Table of Contents
loading

Table of Contents