Installing The Hot-Plug Power Supply Units - Fujitsu Server PRIMERGY TX1330 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for Server PRIMERGY TX1330 M1:
Table of Contents

Advertisement

Figure 39: Replacing the power distribution board
Ê Loosen the captive screw (1).
Ê Push the power distribution board in direction of the arrow (2).
Ê Remove the power distribution board (3).
Ê Insert the new power distribution board in the PSU cage (4).
Ê Push the power distribution board in direction of the arrow (5).
Ê Fasten the captive screw (6).
Ê Connect the two power cables to the power distribution board (see figure
38).
6.3.4.4

Installing the hot-plug power supply units

Ê Install the power supply units as described in section
power supply unit" on page
TX1330 M1
106.
Upgrade and Maintenance Manual
Power supply
"Installing a hot-plug
115

Advertisement

Table of Contents
loading

Table of Contents