Throttle Body Removal And Installation - Suzuki GSF650A Service Manual

Hide thumbs Also See for GSF650A:
Table of Contents

Advertisement

1D-10 Engine Mechanical:

Throttle Body Removal and Installation

Removal
1) Disconnect the battery (–) read wire. Refer to
"Battery Removal and Installation in Section 1J
(Page 1J-12)".
2) Remove the fuel tank. Refer to "Fuel Tank Removal
and Installation in Section 1G (Page 1G-9)".
3) Disconnect the vacuum hose (1), fuel injector
coupler (2) and fuel feed hose (3).
3
4) Disconnect the STP sensor coupler (4), IAP/TP/IAT
sensor coupler (5) and ISC valve hose (6).
5
5) Remove the air cleaner box mounting bolts.
B817H21406010
2
1
I717H1140015-01
4
6
I717H1140016-01
I717H1140017-01
6) Loosen the throttle body clamp screws.
7) Move the air cleaner box backward.
8) Move the throttle body right side.
9) Disconnect the throttle cables from their drum and
remove the throttle body assembly.
CAUTION
!
After disconnecting the throttle cables, do
not snap the throttle valve from the open to
full close. It may cause damage to the throttle
valve and throttle body.
I717H1140019-01
I717H1140020-01
I717H1140021-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsf650Gsf650sGsf650saGsx650f

Table of Contents