Putting The Pieces Together; Figure 2-3 Items Included With The Origin200 Server, Tower Configuration - Silicon Graphics Origin200 Owner's Manual

Sgi origin200 server owner's guide
Hide thumbs Also See for Origin200:
Table of Contents

Advertisement

Chapter 2: Setting Up an Origin200 System

Putting the Pieces Together

34
Figure 2-3 shows the items packed with a basic Origin200 server in a tower
configuration.
One-module system
Two-module system
adds these items:
Figure 2-3
Items Included With the Origin200 Server, Tower Configuration
AUX port cable
(DIN-8 to DB25)
Console serial cable
(DB9 to DB25)
PC laptop adapter
(DB9 to DB25)
Computer Systems
Origin200 Owner's Guide
Software CDs
Computer Systems
Origin200 Owner's Guide
Origin200 Owners Guide
Chassis
locking tabs
Grounding cable
CrayLink Interconnect
cable

Advertisement

Table of Contents
loading

Table of Contents