2. Tighten the two captive screws at the bottom of the power supply support. See the
figure below.
3. Determine your next course of action and refer to the appropriate steps:
— If you are following these steps as part of another procedure, return to that
— If you are ready to re-assemble your server system, install the following items,
86
Figure 87. Tightening the Power Supply Support Screws
procedure.
in order:
✧ The power supply box. For instructions, see
Box" on page
80.
✧ All installed power supplies. For instructions, see
on page
68.
✧ The power supply filler panel, if necessary. For instructions, see
Power Supply" on page
✧ The top cover. For instructions, see
"Installing the Power Supply
70. Follow step 4 only.
"Installing the Top Cover" on page
®