3�5�3�- MEASURING THREE-PHASE NETWORKS WITH A 4-WIRE CONNECTION, CVM-C11-FLEX-IN-
485-ICT2 MODEL
16
Measurement system:
U
U
U
L1
L2
L3
a
a
a
b
b
b
A
B
A
B
A
B
L1
L2
L3
N
CARGA /LOAD
Figure 6: Three-Phase measuring with a 4-wire connection (CVM-C11-FLEX-IN-485-ICT2)�
It is mandatory connect the SHLD terminal of the probe.
4-3Ph
Alimentación Auxiliar
Power Supply
A1(+)
A2(-)
POWER SUPPLY
OUTPUTS
A2(-)
A1(+)
ROC R01 R02
DOC D01 D02
U
U
U
L1
L3
L2
U
U
U
N
L1
L2
L3
U
U
U
N
L1
L2
L3
IL1 IL2 IL3
INPUTS
RS-485
A(+) B(-)
DIC
DI1
DI2
OUT+
OUT-
SHLD
IL3
IN
IL1
IL2
OUT-
SHLD
IN
Instruction Manual
CVM-C11
Need help?
Do you have a question about the CVM-C11 and is the answer not in the manual?
Questions and answers