Carrier Weathermaster 48P030-100 Controls, Start-Up, Operation, Service, And Troubleshooting page 293

Single package large rooftop units with comfortlink version 9.x controls
Table of Contents

Advertisement

The pre-start-up checklist must be completed by installing contractor. For Carrier factory start-up, the pre-start-up checklist
must be submitted to the Carrier start-up team prior to arranging start-up. Please refer to the unit submittal or air balance report
for air- flow information.
PROJECT INFORMATION
Project Name _______________________________________
Address ___________________________________________
City ______________________________________________
State/Providence _________________ Zip Code __________
UNIT INFORMATION
Model Number _____________________________________
Software Version ___________________________________
INSTRUCTIONS
Check the box to verify the activity has been completed. If the activity does not apply, write N/A in the box.
Installation
 All packing materials have been removed from the unit.
 The compressor or supply fan shipping hold down brackets (if equipped) have been removed.
 The unit is free of damage. If damage exists, contact your local Carrier representative.
 The unit has been installed in accordance with the service clearances in the installation instructions.
 The supply and return ductwork have been installed per the unit installation instructions.
 The unit is within level tolerances to promote proper condensate drainage.
 The evaporator filters are installed and are clean.
 A properly sized condensate drain trap has been installed and is free from obstructions.
 All required field-installed components or accessories (hoods, sensors, ERV, etc.) have been installed.
Electrical
 The unit power feed is installed, and the phasing is correct (L1, L2, L3).
 The unit voltage and frequency have been verified to match the incoming power feed.
 The power feed wire size meets the MCA requirements on the unit nameplate.
 An overcurrent production device (fuse or breaker) has been installed upstream of the unit and is sized less than or equal to
the MOCP requirements indicated on the unit nameplate.
 A means of disconnecting and locking out electrical service at the unit has been provided.
 All electrical connections and terminals are tight; all terminals are free from corrosion.
 For high SCCR (ETO), field-provided J-type fuses have been installed before the unit terminal block.
Supply Fan
 The supply fan(s) is free from obstruction and rotates properly; set screws are tight.
 The supply fan belt has been installed and is at the proper tension.
 The supply fan pulley and motor pulley are in alignment; shipping tape removed from pulleys.
 All supply fan bearings have been inspected and verified to contain grease.
 For VAV units, pneumatic tubing with a duct pressure pickup has been installed.
 The pressure pick-up pneumatic tubing is free from obstruction or kinks.
Gas Heat
 The gas piping has been connected per the installation instructions and is free from leaks.
 Gas shutoff valves and gas regulator have been installed and have been verified to operate properly.
 The flue vent hoods and intake hoods (if equipped) have been installed.
 The inlet gas pressure and gas quality are enough for proper unit operation.
 For units with staged gas heat, the three LAT sensors have been installed in the supply ductwork and wired back to the unit
per the installation instructions.
PRE-START-UP CHECKLIST FOR WINTER (HEATING)
Installer________________________________________
Contact Name____________________________________
Contact Phone____________________________________
Contact Email____________________________________
Serial Number____________________________________
Unit Tag/Name ___________________________________
CL-15