Carrier Weathermaster 48P030-100 Controls, Start-Up, Operation, Service, And Troubleshooting page 280

Single package large rooftop units with comfortlink version 9.x controls
Table of Contents

Advertisement

Factory-Installed Options (if equipped)
 For units with manual damper, the outdoor air damper maximum position has been set.
 For units with economizer, the outdoor air hood and hood screens have been installed and are clean.
 For units with economizer, the outdoor air damper and return air dampers move freely without binding.
 For units with power exhaust or barometric relief and vertical return, the relief hoods have been folded out, the damper/
exhaust system has been tipped up, and the barometric dampers are free to open.
 For units with modulating power exhaust, pneumatic tubing with a space pressure pickup is installed on the high side port of
the building pressure transducer.
 The pressure pickup pneumatic tubing is free from obstruction or kinks.
 The exhaust fan(s) are free from obstruction and rotate properly.
Sensors/Controls
 OAT and RAT sensors' locations have been reviewed and are reading accurately (relocate if necessary for accurate readings).
 For units configured for space temperature control (SPT), a space temperature sensor is installed.
 For units requiring thermostat control (TSTAT), a two-stage heat/cool thermostat has been installed.
 The SAT sensor location has been reviewed and is reading accurately (relocate if necessary for accurate readings). For air-
side linkage applications with heating, the SAT sensor has been relocated to the supply duct downstream of the heat.
Air Balance
 An air balance has been performed and the supply fan is operating at design airflow.
 The minimum and maximum airflow limits (SP.MN, SP.MX) and heating min airflow (HT.V.M) have been programmed in
ComfortLink based on the system air balance results.
 For VAV units, the supply duct static pressure set point has been programmed in ComfortLink.
 For units with exhaust fan, an air balance has been performed
 For units where air balance has been completed, include a copy of the air balance with the pre-start-up checklist.
CL-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weathermaster 50p030-100

Table of Contents