Fig. 32 — Economizer Control Board (EXB) and Rooftop Control Board (RXB)
POINT NAME
INPUTS
RMTIN
Remote Occupancy Switch
ENTH
Outdoor Enthalpy Switch
SFS
Fan Status Switch
CIRCAHPS
Compressor A1 HPS Feedback
CIRCBHPS
Compressor B1 HPS Feedback
FRZ
Hydronic Heat Freeze Stat
BP
Building Pressure
SP
Supply Duct Pressure
CCT
Air Temp Leaving Evaporator Coil
DTA1
Compressor A1 Disch Temp
RGTA
Suction Gas Temp Circuit A
Not Used
—
OUTPUTS
Not Used
Not Used
ACT_CMD
BELIMO ACTUATORS
PE_1_POS
Power Exhaust 1 Position
PE_2_POS
Power Exhaust 2 Position
ECONOPOS
Economizer Act. Curr. Pos.
ECON2POS
Economizer 2 Act. Curr. Pos.
HYDV_POS
Hydronic Valve
STHUM_POS
Steam Humidifier
CONDFAN3
Condenser Fan Motor 3
CONDFAN4
Condenser Fan Motor 4
PE2
Power Exhaust Relay 2
MLV
Minimum Load Valve
HIR
Heat Interlock Relay
RHV
Humidimizer 3 Way Valve
Table 108 — Rooftop Control Board (RXB) Inputs and Outputs
POINT DESCRIPTION
TYPE OF I/O
Switch Input
DI1
Switch Input
DI2
Switch Input
DI3
Switch Input
DI4
Switch Input
DI5
Switch Input
DI6
Transducer (4-20 mA)
AN1
Transducer (4-20 mA)
AN2
Thermistor
AN3
Thermistor
AN4
Thermistor
AN5
—
AN6
4 to 20 mA
AO1
Digital
PP/MP
Relay
RLY1
Relay
RLY 2
Relay
RLY 3
Relay
RLY 4
Relay
RLY 5
Relay
RLY 6
149
CONNECTOR
I/O POINT NAME
PIN NO.
J4, 1-2
J4, 3-4
J4, 5-6
J4, 7-8
J4, 9-10
J4, 11-12
J5, 1-3
J5, 4-6
J6, 1-2
J6, 3-4
J6, 5-6
J6, 7-8
J9, 1-2
J7, 1-3
J8, 1-3
J8, 4-6
J8, 7-9
J8, 10-12
J8, 13-15
J8, 16-18