Download Print this page

MCi Crusader II 1989 Maintenance Manual page 53

Advertisement

Date
Page
2-25
MC-9 MAINTENANCE MANUAL
Figure 2-69. Aligning Match Marks.
2
Figure 2-70. Installing Capscrews In Equally Spaced Pattern.
16. Check the rotating resistance of the differential gears.
Use the following procedure.
Rotating Resistance Check of Differential Gears
Specification:
50 lb.-ft. (67.8 Nm) torque maximum applied to one side
gear.
NOTE: Make a tool fO" checking the rotat-
ing resistance of the differential gears. the
tool can be made from an axle shaft that
matches the spline size of the differential
side gear. See Figure 2-71.
a. Install soft metal covers over vise jaws to protect the
,g gear (Figure 2- 72).
b. Put the differential and ring gear assembly in the vise.
L _ .
APPROXIMATELY
_
I
~
12 INCHES (304.8
m~)==i
WELD NUT TO
END OF SHAFT
END VIEW
Figure 2•71. Rolllng Resistance Check Tool.
c. Install the tool into the differential until the splines of
the tool and one side gear are engaged (Figure 2-72).
Figure 2-72. lnstaHlng Rolling Resistance Checking Tool.
d. Attach a torque wrench to the nut of the tool and
rotate the differential gears.
As
the differential gears rotate, read
the value indicated on the torque wrench (Figure 2-73).
Figure 2•73. Reading Rolling Resistance Torque.

Hide quick links:

Advertisement

loading

Related Products for MCi Crusader II 1989

This manual is also suitable for:

Mc-9 1989