Download Print this page

MCi Crusader II 1989 Maintenance Manual page 433

Advertisement

Date
1-1-89
Page ___
1_3-_30 _ _
MC-9 MAINTENANCE MANUAL
PARTIAL REASSEMBLY OF OUTPUT SHAFT ASSEMBLY
1. Press the front bearing on output shaft, snap ring to the
rear (figure 13-113).
Figure 13-113. Pressing on Front Bearing.
2. Clean threads of output shaft and bearing nut. Apply 1oc-
tite grade 277 sealant to threads of nut.
3. Install the bearing nut on threads of output shaft and
torque to 250-300 ft. lbs. (figure 13-114).
Figure 13-114. Installing Bearing Nut.
4. Position the key spacer ring on output shaft using the two
5
/,s-24 x 5/s" capscrews, but do not tighten (figure 13-115).
"'-,,,,,, aazm;a.r ,.,.,
Figure 13-115. Attaching Key Spacer Ring.
REASSEMBLY OF MAINSHAFT
1. Place mainshaft in vise equipped with brass jaws or wood
blocks. pilot end down.
NOTE: If previously removed, install all cor-
responding retaining rings in mainshaft gears
with the exception of reverse gear.
2. Install 3rd speed washer with flat side down in the 4th groove
of mainsha~ Rotate washer to align splines of washer with those
of the mainshaft and install the. long key in mainshaft keyway
(figure 13-116).
·
' ,,
Figure 13-116. 3rd Speed Washer Installation.
3. Install 2nd-3rd speed sliding clutch, aligning missing inter-
nal spline of sliding clutch with key (figure 13-117).
Figure 13-117. Installing 2nd/3rd Sliding Clutch.
cm;111

Hide quick links:

Advertisement

loading

Related Products for MCi Crusader II 1989

This manual is also suitable for:

Mc-9 1989