Download Print this page

MCi Crusader II 1989 Maintenance Manual page 439

Advertisement

Date
1-1-89
Page ___
1_3_-3_6 _ _
MC-9 MAINTENANCE MANUAL
24. Remove mainshaft assembly from vise. Install reverse gear
on mainshaft over retaining ring in rear. clutching teeth toward
front. and move it against 1st speed gear. engaging clutching teeth
of gear with external splines of spacer (figure 13-138).
Figure 13-138. Installing 1st Speed Gear.
PARTIAL INSTALLATION OF MAINSHAFT ASSEMBLY
1. Move the right countershaft assembly as far as possible
toward case wall (figure 13-139).
Figure 13-139. Positioning Countershaft Assembly.
2. With the reverse gear as far forward as possible. install the
mainshaft into position in case. meshing corresponding gears on
left countershaft with those on mainshaft (figure 13-140).
...
Figure 13-140. Mainshaft Assembly Installation.
3. Temporarily install the coupling gear. counterbore toward
front of transmission. and partially reassembled output shaft
assembly. engaging splines of output shaft with those of coupling
gear. to center the rear of mainshaft assembly (figure 13-141 ).
Figure 13-141. Centering Mainshaft Assembly.

Hide quick links:

Advertisement

loading

Related Products for MCi Crusader II 1989

This manual is also suitable for:

Mc-9 1989