Download Print this page

MCi Crusader II 1989 Maintenance Manual page 427

Advertisement

Date
1-1-89.
Page
-~_13_-_24 _ _
MC-9 MAINTENANCE MANUAL
2. Press needle bearing into bore of reverse idler gear (fig-
ure 13-85).
Figure 13-85. Pressed-in Needle Bearing.
3. Place inner race of bearing in gear (figure 13-86).
Figure 13-86. Inserting Inner Race.
4. With the two thrust washers in position on each side of
reverse idl~r gear, slide the idler shaft through bore in rear of
case. gear. washers and bore of idler shaft support boss inside
case. To make certain the slot in rear of idler shaft is properly
located to secure lock plate with capscrew in case, align oil
channel hole of idler shaft with that in top of idler shaft support
boss (figure 13-87).
Figure 13-87. Installing Reverse Idler Gear and Shaft.
5. Install the lockplate in slot of idler shaft. Tighten capscrew
securely (figure 1 3-88).
Figure 13-88. Installing Lockplate Capscrew.
Reassembly and installation of right reverse idler gear is
now complete.
REASSEMBLY OF COUNTERSHAFTS
NOTE: Except for the power take-off gears,
the countershafts are identical; reassembly
is the same for each.
1. Install roll pin in bore located in keyway of countershaft.
2. Install the short key in countershaft, tapered end against
roll pin.
3. Install the long key in keyway in countershaft (figure
13-89).
Figure 13-89. Installing Long Key.

Hide quick links:

Advertisement

loading

Related Products for MCi Crusader II 1989

This manual is also suitable for:

Mc-9 1989