Download Print this page

MCi Crusader II 1989 Maintenance Manual page 447

Advertisement

Date
1-1-89'
Page
13-44
MC-9 MAINTENANCE MANUAL
7. Install ¾" interlock ball in bore in front boss (figure 13-173).
Figure 13-173, Interlock Ball Installation.
8. Install the 4th-5th speed shifting bar in upper bore in housing
installing shift yoke on bar. fork to the front (figure 13-17
4).
Figure 13-17 4. 4th-5th Shift Bar Installation.
9. Install yoke lock screw. tighten and wire securely (figure
13-175).
.
.
Figure 13-175. Installing Locking Wire.
10. Remove housing from vise a·nd install the three shift bar
tension balls in bores in_ top of housing (figure 13-176).
Figure 13-176. Replacing Tension Balls.
11. Install three tension springs in bores (figure 13-177).
Figure 13-177. Replacing Tension Springs.
12. Place a new tension spring cover gasket into position on
shift bar housing and install cover. Tighten capscrews to secure
(figure 13-178).
Figure 13-178. Installing Spring Cover.

Hide quick links:

Advertisement

loading

Related Products for MCi Crusader II 1989

This manual is also suitable for:

Mc-9 1989