11.2 Custom foundation - EVSE footprint

The drawing (top view) shows all the necessary measurements to prepare a custom foundation:
• drill the holes to fasten the EVSE to the floor/basement (in yellow)
• prepare the position of the cables coming from the underground cable conduit (in blue)
NOTE
The red arrow indicates the front side of the EVSE.
The measurements in the drawing are in inches and millimeters [in (mm)]
Parameter
Description
A
EVSE base footprint
B
EVSE cabinet footprint
C
Holes to install the EVSE to ground/foundation (M10 bolt)
D
M25 cable glands
22.25
(565)
3.68
7.44
(93.5)
(189)
A
B
7.44
3.68
(189)
(93.5)
4.13
6.75
(105)
(171.5)
2.28
(58)
9.78
(248.5)
C
D