Prepare The Foundation; Prepare The Foundation - General Procedure; Prepare A Casted Foundation; Prepare A Standard Prefabricated Foundation - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Installation
5.3

Prepare the foundation

5.3.1

Prepare the foundation - general procedure

Preliminary requirements
Procedure
1. Select the correct foundation, based on the surface you install the cabinet on.
2. Embed the cables in the ground with or without a cable duct. Refer to the local
rules.
3. Prepare the foundation.
4. If it is necessary, replace the base with an alternative base. Refer to section
5.4.2.
5.3.2

Prepare a casted foundation

Preliminary requirements
Procedure
1. Dig the hole (A) for the casted
foundation. For the specifications,
refer to section 10.12.6.
2. Pour the concrete into the hole. Make
sure that the cable duct/conduit(B) is
in the correct position.
3. Let the concrete dry.
4. Pull the AC wires though the duct/
conduit. Apply the full cable slack.
5. Drill the fixing points (C).
6. Install the dowels (D).
7. Cut the wires to the correct lenght.
5.3.3

Prepare a standard prefabricated foundation

Preliminary requirements
44
Installation engineer
For a casted foundation, refer to section 5.3.2.
For a standard prefabricated foundation, refer to section 5.3.3.
The cover of the removed.
Installation engineer
Installation engineer
Concrete drill
Wire cutter
Concrete
B
Prefabricated foundation.
Refer to section 10.12.7.
9AKK108466A3703-EN | 001
D
C
A

Advertisement