Fiscal Metering System - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

Description
3.10.3

Fiscal metering system

The EVSE can optionally be equipped with an MID compliant DC energy meter. This
upgrade can be installed in the factory or in the field.
A
B
28
A
Time (hh:mm:ss)
Date (YY-MM-DD)
Note: The presence of the MID compliant DC meter is mandatory in some
countries. Do a check of the regulations that are applicable in the country
of installation.
C
Delivered DC power (kWh)
6AGA000032-0115-EN | 004
B
C

Advertisement

Table of Contents
loading

Table of Contents