Description
3.10.3
Fiscal metering system
The EVSE can optionally be equipped with an MID compliant DC energy meter. This
upgrade can be installed in the factory or in the field.
A
B
28
A
Time (hh:mm:ss)
Date (YY-MM-DD)
Note: The presence of the MID compliant DC meter is mandatory in some
countries. Do a check of the regulations that are applicable in the country
of installation.
C
Delivered DC power (kWh)
6AGA000032-0115-EN | 004
B
C