Notes On Installation And Repair Work - Avery Dennison ALS 204 Service And Installation Manual

Hide thumbs Also See for ALS 204:
Table of Contents

Advertisement

1
P
LEASE OBSERVE THE FOLLOWING
1.1 G
ENERAL INFORMATION

Notes on installation and repair work

1.1.3
General information
Before performing any maintenance or repair work:
Block access to the working area of the machine to
unauthorised persons.
Post a notification sign, which calls attention to the
work.
Electro-static discharge:
When the casing is open, protect the electronics
from damage due to electro-static discharge, e.g.
wear an anti-static arm band.
Tools:
Only use suitable tools.
Ensure all tools are at hand before beginning the
work.
Do not attempt to improvise or to use improper tools,
e.g. loosening an interior-toothed screw (Torx) with
a hexagon socket driver.
Rubber and plastic parts:
Do not allow hoses, seals, and other rubber or plas-
tic parts to come into contact with grease, petrol,
benzene, kerosene or mineral oil.
Environmental protection
Avoid unnecessary waste, e.g. use cleaning cloths
sparingly and reuse packing material.
Only store operating materials, such as fresh or
used cleaning agents, in suitable containers. Never
allow them to enter the sewerage system or to seep
into the ground.
Do not put old batteries, removed parts, and used
cleaning agents in household waste. Dispose of
them in an eco-friendly manner.
Packaging materials:
– Only recyclable materials are used for packaging
the machine.
Dispose of unwanted packaging material in an
eco-friendly manner.
Eco-friendly disposal:
Sort the waste as much as possible, e.g. separate
metals from plastics.
Avoid contaminating the waste if possible.
Drop off the waste at the collection points provided
for that purpose
or
Have the waste collected by suitable recycling
agencies.
Use any on-site options.
Observe all relevant rules, ordinances, and laws.
8
ALS
20X
256

Advertisement

Table of Contents
loading

This manual is also suitable for:

Als 206Als 256

Table of Contents