Calculation Sheet For Performance Diagrams - Avery Dennison ALS 204 Service And Installation Manual

Hide thumbs Also See for ALS 204:
Table of Contents

Advertisement

2
T
ECHNICAL
2.3 P
ERFORMANCE DATA

Calculation sheet for performance diagrams

2.3.2
A
B
C
[6]
Example calculation with the calculation sheete for performance diagrams.
A Inputs
B Calculated Values
C Tabs for graphics
The integration of an ALS 20X labeller in a production
line is made easier or even possible with the knowledge
of certain performance data. Such performance data
can be calculated and visualized be means of the Excel
file „ALS20x_Ramping.xls". The file is stored in the
„\utilities" folder on the documentation CD.
Using the calculation sheet
Open the file „ALS20x_Ramping.xls" [6].
– Requires Microsoft Excel or a compatible spread
sheet program.
Enter the the values for „max. speed" and „label
pitch (including gap)" into the input fields [6A].
Read the calculation results [6B].
D
ATA
Inputs
max speed
– Maximum dispensing speed (aimed at).
– Must equal the conveyor speed of the production
line.
label pitch (including gap)
– Length of one label plus one gap (measure from one
label start to another)
Outputs
time for acceleration
Elapsed time after a start signal until the max. dis-
pensing speed is reached.
run length for acc.
– Run length during the acceleration phase (label
length which is already dispensed until the max. dis-
pensing speed is reached).
– The distance between dispensing edge and pres-
sure roller (with direct dispensing) measures
15 mm. Within those 15 mm, the acceleration must
be finished.
21
ALS
20X
256

Advertisement

Table of Contents
loading

This manual is also suitable for:

Als 206Als 256

Table of Contents