Mitsubishi Electric 800 Series Instruction Manual page 186

600v class specification inverter
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

Operation transition
Speed limit value is
increased up to preset value
according to the Pr.7
Acceleration time setting.
Speed
Start signal
Output torque
• If the setting value of Pr.7 and Pr.8 is "0", turning OFF the start signal enables speed control, and the output torque is
controlled by the torque limit value.
Speed
Start signal
Output torque
Item
External operation
Start signal
PU operation
Torque command
Selects the torque command input method and inputs the torque command.
Speed limit
Selects the speed limit input method and inputs a speed limit value.
Torque control under Real sensorless vector control and vector control
Torque control
Speed limit
Speed control is performed during speed
limit. (Thus, torque according to the
commanded is not developed.)
Torque control
Description
STF, STR signal
or
Speed limit value is decreased
Speed limit value
down to zero according to the Pr.8
Deceleration time setting.
Speed limit
Output torque is provided
according to the terminal 1
setting.
Speed limit value
Limit at the torque limit value
on the operation panel or the parameter unit.
Speed control
(speed limit)
Output torque is provided
according to the terminal 1
setting.
PARAMETERS
5
185

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents