Section 5
Drying Station Temperature Check
Required Tools and Consumables
Procedure
Protocol Editor Button
Abbott VP 2000™ Processor Service Manual
30-608308/R1—September 2008
•
Calibrated digital readout thermometer (Omega HH603A
Thermocouple Thermometer, or equivalent) with
immersible thermocouple probe (type J, K, or T as
appropriate for meter calibration)
•
Ten (10) clean slides
CAUTION: Hot Surface. Heated Reagent Basins will be
hot. Take care when performing this procedure.
1. Power ON the Abbott VP 2000 Processor and SCC.
2. Select the <Protocol Editor> button.
Figure 5.5: Select <Protocol Editor>
Drying Station Temperature Check
5-23