Repair, Replacement of Spare Parts

Removal

Installation

7-62
1. Remove the Hoods by gently squeezing inward on the two
(2) metal arms that connect the Hoods to the unit.
2. Remove the Top cover by unscrewing six (6) 6-32 x 1/4
Phillips-Head screws, three (3) on each side of the unit.
3. Remove the 6-32 hex nut that fastens the X-Drive Belt
Assembly to the X/Y Table Assembly (with the Robotic
Arm at the Drying Station, the hex nut is accessible from
the front of the unit).
Reassemble by following the removal procedure in reverse.
CAUTION: Before sliding the Top Cover back into
position, make sure all wiring, cables and connectors
are replaced snugly, within the unit and not hanging
out where they might be sheared off when replacing
the cover.
NOTE: Make sure the two (2) belt fastening lugs are
positioned as shown in Figure 9.19. Remove all the
twist from each belt before fastening it in place. make
sure the belt is positioned above the guide wheels and
shoulder screw heads. Ensure that there is not twist in
the belt when it is installed over the motor and idler
gears.
Section 7
Abbott VP 2000™ Processor Service Manual
30-608308/R1—September 2008